Xcel Energy Highbridge Plant

Three 2,500-cubic-yard mat slabs were poured at an average rate of 500 cubic yards per hour. AVR provided the concrete and utilized three high-capacity pumps, achieving a peak placement rate of 600 cubic yards per hour.

Location:
St Paul, Minnesota
Contractor:
Knutson Construction