Gopher Resources Floor Rehabilitation

Self-consolidating concrete (SCC) with a 30-inch spread was precisely pumped through ports in the one-inch-thick steel-plated floor. Achieving a complete bond without any voids between the steel floor and the placed concrete was essential to the project’s structural integrity.

Location:
Eagan, Minnesota
Contractor:
Langer Construction
Gopher Resources floor pumping